Demand Controlled Ventilation

If your facility is using a traditional ventilation system, the system will operate at a consistent ventilation rate (preset rate of outside air constantly brought into the space) based on an assumed level of occupancy. Consistency is good, unless building occupancy...
Buccaneers Training Facility

Buccaneers Training Facility

This was the new facility for the Tampa Bay Buccaneers that was built on the old Tampa Bay Mall site next to the stadium. BCH Mechanical was selected as the design/builder on this project providing both HVAC and Plumbing design and construction. The office portion...